01. The challenge

Unite Heritage Character With Modern Public Access

The refurbished Albert Hall needed one signage system to work across historic architecture and new construction. It had to respect the original fabric, support intuitive movement through a busy public venue, and meet current Australian accessibility requirements—including braille and disability signage—without feeling added on.

Heritage surfaces where standard fixing methods were unsuitable.

Accessibility, illumination and compliance requirements across the venue.

Multiple contractors, existing infrastructure and a fixed completion date.

02. The solution

Design the Detail. Coordinate the Whole.

Guidance Beyond Supply

The client needed more than manufacturing. ARCOM advised on construction methods, materials, compliance, illumination, durability and long-term maintenance. The team translated the architect’s vision into practical systems, identifying opportunities to simplify manufacturing and reduce unnecessary cost without compromising the intended finish.

Heritage-Safe Installation

Curved architectural forms and custom feature elements translated the design concepts into practical, buildable signage.

Compliance Built In

Custom fixing methods were developed to securely install feature branding across natural rock and irregular surfaces.

Programme-Led Coordination

Sign locations, scale and installation details were carefully resolved so navigation improved without disrupting the vineyard landscape.

03. The outcome

A Modern Signage System That Belongs in a Heritage Landmark

Fully Compliant

Wayfinding, braille and accessibility signage delivered throughout

Built to Last

Clear wayfinding delivered with a restrained visual presence

Integrated, Not Added On

Standard fixing methods were unsuitable in parts of the heritage building. ARCOM developed alternative approaches that protected the original structure while integrating wayfinding, braille, disability and illuminated signage across old and new spaces.

Clearer Visitor Journeys

ARCOM coordinated closely with electricians, landscapers and maintenance contractors already working on site. The result supports intuitive visitor movement and includes clear handover documentation for digital signage management.

Delivered With Control

With earlier project delays making timing critical, the programme was mapped backwards from completion. Design approvals, manufacturing, contractor coordination and installation were managed to schedule, with refined production methods improving efficiency without compromising quality.

Gallery

Planning a Complex Public or Heritage Signage Project?

ARCOM works with councils, architects, builders and project teams from concept through installation—reducing risk, simplifying delivery and maintaining design integrity. Clear operational guidance means no unexpected future costs. Predictable by design. WOW, delivered right.